Changes for page Rancher 2

Last modified by Diana Strebkova on 2025/12/12 14:23

From version 12.3
edited by Diana Strebkova
on 2025/12/12 12:26
Change comment: There is no comment for this version
To version 12.15
edited by Diana Strebkova
on 2025/12/12 13:22
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -368,8 +368,37 @@
368 368  ChartMuseum is being deprecated. After the migration is complete, **all harbor charts will be removed from ChartMuseum**, and **old HTTP(S)-based chart repositories will no longer work in Rancher (for internal harbor charts)**.
369 369  )))
370 370  
371 -To ensure a smooth transition, we recommend to **add an OCI-based repository alongside the existing ChartMuseum repository** during the migration phase.
371 +There are two ways to migrate your repositories:
372 372  
373 +1. Direct Transition (Editing the Existing Repository)
374 + You can modify the existing repository directly:
375 +Change the target to “OCI Repository”.
376 +
377 +* Update the URL as required (the repository name cannot be changed).
378 +
379 +After saving, installed apps will automatically start using the updated repository.
380 +
381 +Important limitation: OCI repositories must point directly to a single chart repository, not to a parent folder.
382 +If your old repository included several charts (for example “bitbucket” and “jira”), then after switching to OCI you can only target one chart (e.g. “bitbucket”).
383 +The other charts will no longer receive updates through this repo, and you will still need to create additional repositories for each individual chart.
384 +
385 +1. Add New Repositories One by One (Recommended)
386 +
387 +This approach allows a smooth transition while the old ChartMuseum repository continues to function.
388 +You can:
389 +
390 +* Create a new OCI repository for each chart,
391 +* Keep the old ChartMuseum repo enabled during the migration,
392 +* Migrate applications gradually following the steps described in the main migration guide.
393 +
394 +This avoids disruptions and allows controlled migration.
395 +
396 +Special Case: Old Repo Targeting Multiple Chart Repos
397 +
398 +If your existing repository targets multiple chart repositories and you need the new OCI setup to behave the same way, please contact support. OCI does not support multi-chart endpoints within a single repository, and we can help you find an appropriate solution.
399 +
400 +To ensure a smooth transition, we recommend to **add an OCI-based repository alongside the existing ChartMuseum repository** during the migration phase. If you don't w
401 +
373 373  (% class="box" %)
374 374  (((
375 375  **We will make your charts available in the corresponding new `<pkey>-helm` OCI projects.**
... ... @@ -392,7 +392,8 @@
392 392  11. Add a new repository of type **OCI**.
393 393  11. Name it similarly to your old repo name (e.g. `<chart-repo-name>-oci`). You can't name it the same.
394 394  11. Point it to the new OCI endpoint.
395 -1. ##Disable the Old ChartMuseum Repository Temporarily##. ##This step ensures that Rancher resolves charts from the new OCI repo.##
424 +1. ##Disable the Old ChartMuseum Repository Temporarily## 
425 +##This step ensures that Rancher resolves charts from the new OCI repo.##
396 396  11. Go to **Apps → Repositories**.
397 397  11. Disable the old HTTP(S)-based repository.
398 398  11. Keep it disabled until the migration is done.
... ... @@ -421,9 +421,9 @@
421 421  
422 422  This will reconnect the app to the old repository.
423 423  
454 +=
455 +Automated deployments with Jenkins =
424 424  
425 -Automated deployments with Jenkins
426 -
427 427  In this section, we describe(% style="color:#172b4d" %) how to set-up **automated builds, tests and deployments** for Jenkins.
428 428  
429 429  == Prerequisites ==