... ... @@ -368,36 +368,8 @@
368 368  ChartMuseum is being deprecated. After the migration is complete, **all harbor charts will be removed from ChartMuseum**, and **old HTTP(S)-based chart repositories will no longer work in Rancher (for internal harbor charts)**.
369 369  )))
370 370  
371 -There are two ways to migrate your repositories:
371 +To ensure a smooth transition, we recommend to **add an OCI-based repository alongside the existing ChartMuseum repository** during the migration phase.
372 372  
373 -1. Direct Transition (Editing the Existing Repository)
374 - You can modify the existing repository directly:
375 -11.Change the target to “OCI Repository”.
376 -11.Update the URL as required (the repository name cannot be changed).
377 -
378 -After saving, installed apps will automatically start using the updated repository.
379 -
380 -Important limitation: OCI repositories must point directly to a single chart repository, not to a parent folder.
381 -If your old repository included several charts (for example “bitbucket” and “jira”), then after switching to OCI you can only target one chart (e.g. “bitbucket”).
382 -The other charts will no longer receive updates through this repo, and you will still need to create additional repositories for each individual chart.
383 -
384 -1. Add New Repositories One by One (Recommended)
385 -
386 -This approach allows a smooth transition while the old ChartMuseum repository continues to function.
387 -You can:
388 -
389 -* Create a new OCI repository for each chart,
390 -* Keep the old ChartMuseum repo enabled during the migration,
391 -* Migrate applications gradually following the steps described in the main migration guide.
392 -
393 -This avoids disruptions and allows controlled migration.
394 -
395 -Special Case: Old Repo Targeting Multiple Chart Repos
396 -
397 -If your existing repository targets multiple chart repositories and you need the new OCI setup to behave the same way, please contact support. OCI does not support multi-chart endpoints within a single repository, and we can help you find an appropriate solution.
398 -
399 -To ensure a smooth transition, we recommend to **add an OCI-based repository alongside the existing ChartMuseum repository** during the migration phase. If you don't w
400 -
401 401  (% class="box" %)
402 402  (((
403 403  **We will make your charts available in the corresponding new `<pkey>-helm` OCI projects.**
... ... @@ -420,13 +420,12 @@
420 420  11. Add a new repository of type **OCI**.
421 421  11. Name it similarly to your old repo name (e.g. `<chart-repo-name>-oci`). You can't name it the same.
422 422  11. Point it to the new OCI endpoint.
423 -1. ##Disable the Old ChartMuseum Repository Temporarily## 
424 -##This step ensures that Rancher resolves charts from the new OCI repo.##
395 +1. ##Disable the Old ChartMuseum Repository Temporarily##. ##This step ensures that Rancher resolves charts from the new OCI repo.##
425 425  11. Go to **Apps → Repositories**.
426 426  11. Disable the old HTTP(S)-based repository.
427 427  11. Keep it disabled until the migration is done.
428 428  1. ##Update Existing Applications to Use the New OCI Repo##
429 -Applications deployed with the old repository still contain the old repo name in their metadata. You must upgrade them once to transition.
400 +##Applications deployed with the old repository still contain the old repo name in their metadata. You must upgrade them once to transition.##
430 430  11. Go to **Apps → Installed Apps**.
431 431  11. Open the application that was deployed using the old repo.
432 432  11. Click **Upgrade**.
... ... @@ -433,9 +433,7 @@
433 433  11. In the list of available chart repositories (scroll to the bottom), select the **new OCI repository**.
434 434  11. Choose the chart version you want to deploy (same or newer).
435 435  11. Click **Upgrade**.
436 -1. ##Re-enable the Old Repository (Optional) ##
437 -If you still need the old repo for other apps, re-enable it after the migration steps above.
438 -**Note:** Even if a newer chart version exists in the old repository, your migrated app **will not see it**, because it is no longer connected to that repo
407 +1. ##Re-enable the Old Repository (Optional) If you still need the old repo for other apps, re-enable it after the migration steps above.##Note: Even if a newer chart version exists in the old repository, your migrated app **will not see it**, because it is no longer connected to that repo
439 439  
440 440  ----
441 441  
... ... @@ -450,9 +450,24 @@
450 450  
451 451  This will reconnect the app to the old repository.
452 452  
453 -=
454 -Automated deployments with Jenkins =
422 +----
455 455  
424 +## Summary
425 +- Add new OCI repo → disable old repo → upgrade apps → reconnect to OCI repo.
426 +- After upgrade, apps no longer track versions from the old repository.
427 +- Old repository will stop functioning after ChartMuseum shutdown, so migration is required.##
428 +
429 +----
430 +
431 +If you want, I can also generate:
432 +- a shorter version (1-pager),
433 +- a diagram,
434 +- a Rancher UI screenshot guide,
435 +- or a version tailored for your team’s internal wiki.
436 +
437 +
438 += Automated deployments with Jenkins =
439 +
456 456  In this section, we describe(% style="color:#172b4d" %) how to set-up **automated builds, tests and deployments** for Jenkins.
457 457  
458 458  == Prerequisites ==