Changes for page Rancher 2
Last modified by Diana Strebkova on 2025/12/12 14:23
From version 15.3
edited by Diana Strebkova
on 2025/12/12 13:55
on 2025/12/12 13:55
Change comment:
There is no comment for this version
To version 14.1
edited by Diana Strebkova
on 2025/12/12 13:32
on 2025/12/12 13:32
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -371,23 +371,33 @@ 371 371 There are two ways to migrate your repositories: 372 372 373 373 1. ##Direct Transition (Editing the Existing Repository)## 374 -1*. Change the target to “OCI Repository”. 375 -1*. Update the URL as required (the repository name cannot be changed). 376 -1*. After saving, installed apps will automatically start using the updated repository. 377 -1*. (% class="box" %) 378 -((( 374 +11. Change the target to “OCI Repository”. 375 +11. Update the URL as required (the repository name cannot be changed). 376 + 377 +1. Direct Transition (Editing the Existing Repository).You can modify the existing repository directly: 378 +Change the target to “OCI Repository”.Update the URL as required (the repository name cannot be changed). 379 + 380 +After saving, installed apps will automatically start using the updated repository. 381 + 379 379 Important limitation: OCI repositories must point directly to a single chart repository, not to a parent folder. 380 380 If your old repository included several charts (for example “bitbucket” and “jira”), then after switching to OCI you can only target one chart (e.g. “bitbucket”). 381 381 The other charts will no longer receive updates through this repo, and you will still need to create additional repositories for each individual chart. 382 -))) 383 -1. Add New Repositories One by One (Recommended), preserve the old one till the end. This approach allows a smooth transition while the old ChartMuseum repository continues to function. You can: 384 -1*. Create a new OCI repository for each chart, 385 -1*. Keep the old ChartMuseum repo enabled during the migration, 386 -1*. Migrate applications gradually following the steps described here. 387 -1*. This avoids disruptions and allows controlled migration. 388 -1. //Special Case: Old Repo Targeting Multiple Chart Repos// 389 -If your existing repository targets multiple chart repositories and you need the new OCI setup to behave the same way, please contact support. OCI does not support multi-chart endpoints within a single repository, and we can help you find an appropriate solution. 390 390 386 +1. Add New Repositories One by One (Recommended) 387 + 388 +This approach allows a smooth transition while the old ChartMuseum repository continues to function. 389 +You can: 390 + 391 +* Create a new OCI repository for each chart, 392 +* Keep the old ChartMuseum repo enabled during the migration, 393 +* Migrate applications gradually following the steps described in the main migration guide. 394 + 395 +This avoids disruptions and allows controlled migration. 396 + 397 +Special Case: Old Repo Targeting Multiple Chart Repos 398 + 399 +If your existing repository targets multiple chart repositories and you need the new OCI setup to behave the same way, please contact support. OCI does not support multi-chart endpoints within a single repository, and we can help you find an appropriate solution. 400 + 391 391 To ensure a smooth transition, we recommend to **add an OCI-based repository alongside the existing ChartMuseum repository** during the migration phase. If you don't w 392 392 393 393 (% class="box" %)